Skip to content

AUSTRALIA & NEW ZEALAND · PROJECT PLANNING

Storage starts with
a clearer brief.

From a home battery to a utility project, the right starting point is your site, your loads and your goals. Find the relevant Tecloman product family and prepare the information our Australian team needs.

Project planning application visualisation
Western Australian landscape · Ymir 5K application visualisationIllustrative scene, separate from our project photographs.

01 · FIND YOUR STARTING POINT

A product family for your application.

Explore the relevant range, then discuss the complete system configuration with our team.

01 / RESIDENTIAL

Homes & solar storage

Start with your electricity use, existing inverter, available space and the circuits you want to support.

Residential products
02 / COMMERCIAL & INDUSTRIAL

Business & industry

Share your demand profile, operating hours, onsite generation and the role storage should play at your facility.

C&I products
03 / UTILITY

Grid & renewable projects

Outline the point of connection, required power and energy, operating objectives and project development stage.

Utility-scale products
04 / REMOTE POWER

Mining & standalone power

Bring together load data, existing generation, site conditions and the continuity requirements for your operation.

Explore the solution
05 / FLEXIBLE POWER

Mobile & temporary sites

Describe the loads, operating duration, mobility needs and any solar or generator equipment already on site.

Mobile storage products
06 / AUSTRALIAN BATTERIES

Firefly Pro & CEC Listing

Explore the Firefly Pro high-voltage residential battery family and check the current official battery register.

CEC Listing

02 · PREPARE THE SITE PICTURE

Useful details. Better conversations.

What to bring

  1. 01Location & application. Country, site location and what the site does.
  2. 02Load & generation data. Your load profile, operating hours and existing solar, inverter or generator details.
  3. 03Power & energy goals. Required output and usable storage capacity, if already defined. If unknown, describe the loads and operating time.

What to confirm

  1. 04Operating requirements. Solar self-consumption, demand management, essential-load backup or standalone operation.
  2. 05Site & connection conditions. Space, access, environment, electrical information and the status of network discussions.
  3. 06Project timing & documents. Target dates and available site plans or single-line diagrams.

Battery output, usable energy and backup capability are separate design considerations. The complete configuration should be checked for the actual site, compatible equipment and local connection requirements.

03 · START YOUR PROJECT BRIEF

Turn your goal into a useful enquiry.

Choose a starting point. The brief is prepared in your browser; nothing is sent until you submit an enquiry.

Questions before the next step?

Explore practical answers about sizing, compatibility, backup, documents and project enquiries.

Battery storage FAQs